![]() YPVS
350 |
||
|
|
Most things are finished now, as you can see from this picture there does not seem to be that much left to do. In actual fact I still have to finish the cooling system, the autolube oil system and install the carbs and filters. After that I can do one last check before trying to start her! Below are some more pictures of the bike at this stage. Hopefully, the next set you see (could be a few weeks though) will be of the finished article.
The pictures above are with the wavy front discs that I had such trouble getting from BUSTERS. I contacted ABE Engineering who were amazing. They knew exactly what I wanted, they had a set of discs on the shelf, they were really competitive with their price and they arrived at my door the very next day. Can't get any better than that. Not far to go now and it will all be finished. I would have been finished by this Easter weekend, but my mate Baz ripped me away from working on her to fit his new kitchen floor. Thanks Baz!
|
|